Yakima County Logo
  • Yakima County
  • Departments
  • Services
  • Courts
  • Government
  • Community
  • About Us
Regional Stormwater
Management Program
128 N 2nd St, Yakima Washington 98901 - Phone: (509) 574-2300 - Toll Free In State (800) 572-7354 - Fax: (509) 574-2301
  • Home
  • Management Program
  • Stormwater Policy Group
  • Public Meetings and Events
  • Low Impact Development
  • Manual
  • Illicit Discharges
  • Training Opportunities
  • Permits and Regulations
  • Stormwater Utilities
  • Progress Reports
  • FAQs
  • Documents
  • Maps
  • Glossary
  • Links
 
Download Adobe Acrobat Reader

Project

Construction

Monitoring

Monitoring Volunteer Opportunity

Monitoring Results

 

 

Low Impact Development (LID)

and Green Infrastructure Overview

Bioretention with Elevated Underdrain

Example of LID: Bioretention with Elevated Underdrain

The objective of this project is to demonstrate Low Impact Development (LID) stormwater practices in Yakima County.

In addition to the demonstration project, a Regional LID Manual is under development. Both are funded by a grant from the Washington state Department of Ecology with 25% matching funds from Yakima County and the City of Yakima.

LID is a stormwater management approach to minimize collection, runoff, and end-of-pipe treatment. The goal of using LID is to mimic a site's predevelopment hydrology by choosing design techniques that infiltrate, filter, store, evaporate, and detain runoff close to its source. LID practices include vegetated swales, permeable pavements, “green roofs” and “rain gardens”.

Design guidance and examples of LID methods are limited in semi-arid areas with dry summer - cold winter climates. Research shows that LID benefits are most effective in low and moderate rainfall conditions like those in Yakima. Demonstrating the effectiveness of LID infiltration practices such as porous pavements and amended soil bioswales would provide tangible evidence that LID is achievable in the local climate. These practices will help improve water quality problems of fecal coliform and elevated metals in an area with ESA listed fish species.

This demonstration project will validate the use of infiltration practices in the Yakima area, thus reducing stormwater runoff pollutant loading, and improving water quality. This project will be implemented from January 1, 2010 and completed December 31, 2014.

Pervious concrete recently installed at local business parking lot.

LID prevents this.

Stormwater outfall into Wide Hollow Creek.

 

Yakima Regional Low Impact Development Manual
(web version - 8.26 MB)

Yakima Regional Low Impact Development Manual
(high resolution version - 76.6 MB)

 

Additional Resources

EPA LID

Washington Stormwater Center LID

Green Infrastructure in Arid and Semi-Arid Climates

National Low Impact Development Hydrologic Analysis Manual

 

Questions? Concerns? Suggestions?
  If you have questions regarding the content of the site call (509)574-2300.
If you have any questions regarding this web site please e-mail webmaster@co.yakima.wa.us.